noscriptScaffold Tag Kits | TED

Centurion Europe

Scaffold Tag Kits

1 Variations

All scaffold structures must be inspected under the following conditions:

- After the initial erection.
- Following any exposure to weather that could affect strength or stability.
- Following any substantial alteration/changes.
- At regular intervals (not exceeding 7 days from previous inspection).